ROI calculator
Calculate when APS will start generating savings in your plant
The calculator is based on real production parameters: machine-hour cost, WIP value, and planner labor time.
Machine utilization
APS recovers 3–5% of actual resource run time.
WIP reduction
APS streamlines flow and reduces work in progress by 10–25% , freeing tied-up capital.
Planner time
APS cuts manual plan adjustments by 30–50% .
Input data
Enter your plant parameters
Industry
Select an industry to automatically set a typical machine-hour cost.
Machine-hour cost
You can edit this value if you know the exact cost in your plant.
Number of machines
Count all machines and production workstations that will be scheduled by the APS system.
Working hours
Average number of hours one machine runs per month.
- 1 shift = 160 h/month
- 2 shifts = 320 h/month
- 3 shifts = 480 h/month
WIP value
Work In Progress — the value of products in production. APS reduces WIP by 10–25%, freeing working capital. Savings include amortization of the freed amount (spread over 12 months) plus ongoing reduction in financing costs.
Planner cost
Total monthly cost of production planners. The APS system automates 30–50% of their work.
Results
Estimated savings and return on investment
Monthly savings breakdown
WIP reduction: freed capital (PLN 87,500) is amortized over 12 months + ongoing savings on financing cost (12% annually).
ROI chart
Cumulative net profit from implementation (24 months)
The chart shows when the implementation breaks even (BEP) and how savings grow in subsequent months.
How much are you losing?
A company with turnover of PLN 10M per year:
= PLN 500,000 per year
Underutilized machines, WIP, delays — real costs that can be reduced.
Recovers a significant share of this amount — through better resource utilization, WIP reduction, and planner time savings.
Want to calculate this on your actual data?
Book a technical consultation where we'll analyze your production parameters and prepare a personalized calculation.